Brno City Council approved the selection of a contractor to build a new wellness facility at Lužánky Swimming Pool last October. Photo: TD, TP/ Brno Daily.
Brno, Oct 25 (BD) – A new wellness area was added to the existing swimming stadium. The facility was opened this morning. The opening was attended by First Deputy Mayor of Brno, Petr Hladík (KDU-ČSL).
![](https://i0.wp.com/brnodaily.com/wp-content/uploads/2019/10/swimming-pool.jpg?resize=1008%2C756&ssl=1)
“Visitors will be able to use two steam cabins, a bio sauna, a Finnish sauna, […], and a jacuzzi. A cold pool with a relaxation room will be located on the western terrace,” said Hladík in a press release.
![](https://i0.wp.com/brnodaily.com/wp-content/uploads/2019/10/big-sauna-.jpg?resize=964%2C723&ssl=1)
The company SYNER won the tender, with the lowest bid price of CZK 25.7 million, excluding VAT.
![](https://i0.wp.com/brnodaily.com/wp-content/uploads/2019/10/inside-VIP-zone.jpg?resize=1008%2C756&ssl=1)
![](https://i0.wp.com/brnodaily.com/wp-content/uploads/2019/10/indoor-shower-area.jpg?resize=1008%2C756&ssl=1)
![](https://i0.wp.com/brnodaily.com/wp-content/uploads/2019/10/Resting-area.jpg?resize=1008%2C756&ssl=1)
![](https://i0.wp.com/brnodaily.com/wp-content/uploads/2019/10/spa-area-luzanky-pool.jpg?resize=1024%2C768&ssl=1)